OVERVIEW
Located in the scenic 95-acre Mequon Rotary Park, the All-User Playground will be adjacent to the south pavilion at 4100 Highland Road in Mequon.
Designed by Gerber Leisure and Zimmerman Architectural Studios, the playground will feature a large central structure with ramps, slides, and climbing elements. Surrounding it will be swings— including a wheelchair-accessible swing—sliders, archways, mounds, exercise equipment, and a variety of other play structures. The design also includes internal pathways, landscaping, benches, and shaded rest areas, all thoughtfully integrated to complement the park’s natural landscape. Additional enhancements include a safe entrance, perimeter barriers, improved pathways leading to the playground, and upgraded restrooms.
To keep children engaged as they grow, the playground will offer multiple swings and climbing structures at varying heights, providing new challenges over time.
The state-of-the-art playground equipment is custom-made specifically for this site, prioritizing safety, durability, and longevity. Unlike pre- engineered sets, nearly all components are constructed from steel and other metals, with minimal plastic use. This high-quality design requires little to no maintenance, reducing long- term costs. Additionally, the equipment comes with industry-leading warranties, ensuring lasting value for the community.
A STATE-OF-THE-ART PLAYGROUND
PRIORITIZING SAFETY, DURABILITY, AND LONGEVITY

COSTS & TIMELINE
THE BREAKDOWN OF COSTS IS AS FOLLOWS:
| Architectural/Structural/Civil Engineering | $68,500 |
| Playground Equipment | $2,713,767 |
| Construction* | $1,125,591 |
| Restroom (Accessible) | $74,297 |
| Professional Services | $70,000 |
| Endowment | $500,000 |
| FUNDRAISING GOAL | $4,552,155 |
|---|
*Includes: Site Utilities, Site Grading, Concrete Paving, Asphalt, Paving, Landscaping, Donor Signage, Entrance Sign, Fencing, General Conditions, CM Fee, Contingency
THE ANTICIPATED TIMELINE:
| Launch Capital Campaign | Q2 2025 |
| Finalize Architectural Plans / Complete Engineering | Q2-Q3 2025 |
| Obtain City Approvals | Q3-Q4 2025 |
| Groundbreaking | Q4 2025 |
| Order Playground Equipment | Q4 2025 |
| Install Playground Equipment/Complete Construction | Q4 2026-Q2 2027 |
| Dedication | Spring 2027 |
|---|
CAPITAL CAMPAIGN FUNDRAISING
COMMITTEE MEMBERS
Sandy Custer, Co-Chair
Stan Smith, Co-Chair
Don Sommer, Co-Chair
Peter Buening
Tim Carr
Dan Gannon
Karl Hertz
Jenne Hohn
Andy Nerbun
Steve Peterman
John Rosing
Steve Schmitt
Kathleen Schneider
Cindy Shaffer
Lynn Streeter