OVERVIEW

Located in the scenic 95-acre Mequon Rotary Park, the All-User Playground will be adjacent to the south pavilion at 4100 Highland Road in Mequon.

Designed by Gerber Leisure and Zimmerman Architectural Studios, the playground will feature a large central structure with ramps, slides, and climbing elements. Surrounding it will be swings— including a wheelchair-accessible swing—sliders, archways, mounds, exercise equipment, and a variety of other play structures. The design also includes internal pathways, landscaping, benches, and shaded rest areas, all thoughtfully integrated to complement the park’s natural landscape. Additional enhancements include a safe entrance, perimeter barriers, improved pathways leading to the playground, and upgraded restrooms.

To keep children engaged as they grow, the playground will offer multiple swings and climbing structures at varying heights, providing new challenges over time.

The state-of-the-art playground equipment is custom-made specifically for this site, prioritizing safety, durability, and longevity. Unlike pre- engineered sets, nearly all components are constructed from steel and other metals, with minimal plastic use. This high-quality design requires little to no maintenance, reducing long- term costs. Additionally, the equipment comes with industry-leading warranties, ensuring lasting value for the community.

parallax background

View the Support Booklet

Interested in learning more about the project? Tap the button below to view or download our Support Booklet PDF.


VIEW/DOWNLOAD PDF

COSTS & TIMELINE

THE BREAKDOWN OF COSTS IS AS FOLLOWS:
Architectural/Structural/Civil Engineering $68,500
Playground Equipment $2,713,767
Construction* $1,125,591
Restroom (Accessible) $74,297
Professional Services $70,000
Endowment $500,000
FUNDRAISING GOAL $4,552,155

*Includes: Site Utilities, Site Grading, Concrete Paving, Asphalt, Paving, Landscaping, Donor Signage, Entrance Sign, Fencing, General Conditions, CM Fee, Contingency

THE ANTICIPATED TIMELINE:
Launch Capital Campaign Q2 2025
Finalize Architectural Plans / Complete Engineering Q2-Q3 2025
Obtain City Approvals Q3-Q4 2025
Groundbreaking Q4 2025
Order Playground Equipment Q4 2025
Install Playground Equipment/Complete Construction Q4 2026-Q2 2027
Dedication Spring 2027

CAPITAL CAMPAIGN FUNDRAISING
COMMITTEE MEMBERS

Sandy Custer, Co-Chair
Stan Smith, Co-Chair
Don Sommer, Co-Chair
Peter Buening

Tim Carr
Dan Gannon
Karl Hertz
Jenne Hohn

Andy Nerbun
Steve Peterman
John Rosing
Steve Schmitt

Kathleen Schneider
Cindy Shaffer
Lynn Streeter